-Re-Square And Level At The Onset Of Each Job
-Plumb All Walls Point To Point With "Plumb-It" Level
-String All Walls For Complete Accuracy
-Hand Pick Each Stud For Straightness
-Hand Pick All Wall Plates For Straightest Material
-Glue And Screw All Sub-Flooring
-Hand Drive All Toe-Nailed Framing Members
-Glue Between I-Joist And Hangers To Prevent Squeaking
-String All Hips,Valleys And Ridges
-Shim All Windows For Proper Alignment
-Shim All Doors For Proper Alignment / Install Hinge Screws
-Silicone And Tape All Windows / Doors To Manufacturers Instructions
-Align All Framing Members From Basement To Roof       